
Here is a view of the setup during the first tests. The southern legs of the tower are set up with the solar panel and tracking motor. The bubble blowing unit is sitting on the ground. The controller is to the left (the previous photo was a close up of this setup), and the laptop connected for doing software changes to the EEPROM.